HSG | Engineering & Construction Pte Ltd

Bedok South Station

Status

Completed

Sector

Infrastructural Project

Square

19,907.84m²

Commencement date

2024

Project description

A project awarded by the Land Transport Authority (LTA) of Singapore, the Bedok South Station and Tunnels have a land area of 24,274.01 square metres, a total construction area of 19,907.84 square metres and a plot ratio of 0.82. Designed and constructed by China Jingye Engineering Corporation Limited (Singapore Branch), the Bedok South Station and Tunnels project is an underground station with tunnels spanning 270 metres.

Together with Bayshore, Marine Parade, Marine Terrace, Siglap and Tanjong Rhu stations, Bedok South station will serve as the sixth Civil Defence shelter along the East Coast stretch of Thomson-East Coast Line (TEL). Works for the Bedok South Station and Tunnels commenced in 2016 with completion slated for 2025. The 13-kilometre East Coast stretch of the Thomson-East Coast Line (TEL) will connect commuters living in the eastern parts of Singapore and who are not directly served by the rail network currently, such as those in Tanjong Rhu, Siglap, Marine Parade, Upper East Coast and Bedok South, to the heart of the city. As part of the 43-kilometre long TEL, the East Coast stretch

Key Specifications & Features

The East Coast stretch of the TEL will be completed in two stages. The first seven stations from Tanjong Rhu to Bayshore will be ready in 2023, while the remaining two stations (Bedok South and Sungei Bedok) will be completed in 2025.

Request more information